CASE STUDIES FROM SACEMA NORDIC PROJECTS

SaCeMa Nordic Projects Completed Challenging Industrial Relocation of 4000 MT Production Line from Northern Finland




SaCeMa Nordic Projects concluded work on the industrial relocation of a production line from Northern Finland.

350 x 40’ equipment was moved over 8 months, ending off with 3500 m3 Break Bulk loaded onto part charted vessel during challenging weather conditions in Northern Finland during winter.

The complete production line was safely delivered to place of receipt.

Project Details:

– Relocation / Production Line

– Length: 200 meters

– Width: 6 meters

– Height: 18 meters

– Weight: About 4000 mt

SaCeMa Nordic Projects adding to Northern Light in Norway after shipping Generators from Northern Ireland to North Norway




Shipment from place of loading FCA Craigavon, Northern Irland (UK) via port of loading Immingham (UK) to port of discharge Port of Mehamn, North Norway (NO).


Commodity: Generators and parts

Size and Weight: Each 1,200 x 352 x 380 cm / Each 35,000 kg

Quantity: 2 pcs


The generators were delivered smoothly to their destination in North Norway.

SaCeMa Nordic Projects in Denmark move one of the world's largest paper making machines, weighing approximately 8,000 tons in total, from Sweden to Poland by truck




The paper making machine measured 350 m. in length, 12 m. in width and 19 m. in height. The shipment also included 480 truckloads of in-gauge and out-of-gauge (OOG) pieces, with some units tipping the scales at 108 tonnes. 

The relocation took place over the duration of 7 months, and the project was finalized ahead of schedule. 